julia
4ee9be27 - Shuffle LinearAlgebra tests to the front of the test queue (#34456)

Commit
5 years ago
Shuffle LinearAlgebra tests to the front of the test queue (#34456) They take much longer than the rest of the tests, so if they're run at the end, they often determine the length of the entire test run. Instead, try running them at the start while there's still plenty of work to be done. Hopefully this will reduce overall duration of CI tests. If this doesn't work out as planned, we can try a more fine grained strategy to load balancing (e.g. by checking in a table of approximate runtimes and sorting according to that).
Author
Parents
Loading